The Open House held Sep. 14th allowed contracted engineer Brandon Baxter with Ragan/Smith to present the construction detours that will take place during the Critz Ln Redesign Project for discussion with BOMA and Town Residents. The presentation showed a regional detour along Thompson's Station Rd East and signage directing traffic away from Critz lane as well as local detours for residents.
The documents and slides presented during the meeting are available on the Critz Lane Redesign webpage on the Town Website along with timeline information and construction layouts.
https://www.thompsons-station.com/2344/Critz-Lane-Redesign